4) 100-1-16(16%S.C.)formula:
100-1-50
32%
Water
68%
The performance of concrete with 100-1-16 (P.O.42.5,30℃)
Water reduction(dos. 1.0% by weight)
5%
Initial slump(mm)
50
30mins slump(mm)
200
60mins slump(mm)
200
5) 100-9-16(16%S.C.)formula:
100-9-50
32%
Water
68%
The performance of concrete with 100-9-16 (P.O.42.5,30℃)
Water reduction(dos. 1.0% by weight)
5%
Initial slump(mm)
30…